enLanguage

Products

Rail
video
Rail

Rail G Clamp

Rail first aid, also called track fracture fastening device, is a portable railway track holeless fixture maintenance works.

Features

Rail First Aid

Rail first aid, also called track fracture fastening device, is a portable railway track holeless fixture maintenance works.

image001

1. Reinforce the welding tape that is judged to be damaged on the line.

2. First aid reinforcement treatment when the rail or welding belt is broken.

3. Thermite welding, pressure welding, resistance welding belt at the damage all-around firm clamp. The damaged rail between or on the sleeper is clamped. Alloy steel casting, beautiful shape, light weight, easy to carry, impact resistance, long service life.

4. In each kilometer mark and half a kilometer track at the bottom of the reserve set, use is very timely and convenient.

5. When the rail is broken, the operator does not need to carry the drum splint and the first aid device to the scene, which reduces the labor intensity of the operator and greatly reduces the processing time of broken rail.

6. The installation of the damaged rail reinforcement can ensure the normal operation of the train.

product-740-740
product-740-740
product-549-375
product-549-375

 

FAQ

 

Q: How to place an order?

A: Please email or fax us the purchase order. Or you can ask us to send a proforma invoice for your order.

Regarding your order, we need to know the following information:

A. Transportation information - company name, street address, telephone number, fax number, airport or port of destination, mode of transportation (express, air or sea container)

B. Product information: model, quantity, unit price

C. Delivery time requirements

D. Freight payment method (collect or prepaid)

E. Contact information of forwarder, if available in China or Hong Kong

 

Q: How do you usually make payment?

A: We accept payment by bank, wire transfer, Western Union or paypal.

 

Q: What about delivery time?

A: A trial or small order usually takes 7-14 days. Large orders or container orders take 25-30 days. We will specify a delivery time before you place an order. If we encounter difficulties in the production process and cannot deliver the goods to them in time, we will inform you in advance and tell you the reason.

 

Hot Tags: rail g clamp, China rail g clamp manufacturers, suppliers, factory, , Temporary Rail Clamp

Previous:

No Information

You Might Also Like

(0/10)

clearall