Products

Non-Insulated
video
Non-Insulated

Non-Insulated Gauge Tie Rod

Non-Insulated Gauge Tie Rod Definition Non-Insulated Gauge Tie Rod is a metal rod used to connect and secure railway tracks to keep the gauge stable. Usage It is mainly used for the maintenance of railway tracks to ensure that the spacing (gauge) between the tracks is consistent, thereby...

Features

Non-Insulated Gauge Tie Rod

 

Definition

Non-Insulated Gauge Tie Rod is a metal rod used to connect and secure railway tracks to keep the gauge stable.

Usage

It is mainly used for the maintenance of railway tracks to ensure that the spacing (gauge) between the tracks is consistent, thereby improving the smoothness and safety of train operation.

Railroad FishPlate

 

Type Model Number Per Weight(kg)
Ordinary gauge tie rod M32*1810 15.2
Ordinary gauge tie rod M36*1810 18.7
Insulated gauge rod in the middle M32*1810 16.6
Insulated gauge rod in the middle M36*1810 21

 

Product introduction

 

Features

Non-insulating means that this tie rod does not block current, so it is suitable for railway systems that require current to pass through, such as electrified railways.

Structure

Usually made of high-strength steel, with enough rigidity and toughness to withstand various forces and vibrations during train operation. Both ends may be designed with threads or other connecting devices to facilitate connection with rails or other fixed devices.

Application

In the laying and maintenance of railway tracks, non-insulated gauge tie rods are widely used to connect adjacent tracks to maintain the stability of the gauge.

Maintenance

Regular inspection of the connection status, wear and corrosion of the tie rod is an important measure to ensure railway safety. If the tie rod is found to be damaged or seriously worn, it should be replaced in time to avoid potential safety risks.

 

 

Our Products

Railway Maintenance Clamp
 
W14 Rail Fastening System
 
Glued Insulated Rail Joints
 

 

 

FAQ

Q: What information should we provide if we ask for a quote?

A: Drawings of all sizes; Materials; Surface treatment; The number.

Q: What are your terms of payment?

A: T/T 30% as deposit, 70% before delivery. Before you pay the balance, we will show you photos of the products and packaging.

Q: What is the delivery time?

A: The exact delivery time depends on the item and quantity of the order.

Q: Can you produce according to the sample?

A: Yes, we can produce according to your sample or technical drawing.

Q: Can you provide samples?

A: If available, samples can be provided, but the customer must pay the sample fee and Courier fee.

Q: Do you test the goods before delivery?

A: Yes.

 

 

Hot Tags: non-insulated gauge tie rod, China non-insulated gauge tie rod manufacturers, suppliers, factory, Screw Spike, , Tie Plate, Railway Sole Plates

You Might Also Like

(0/10)

clearall