Railway Broken Rail Clamp Railway rail clamp, as an important tool in railway maintenance, mainly plays a role in the emergency treatment of railway rail break. Application scenario When the railway breaks the track, the broken track clamp is used to fix the broken joint in an emergency to...

Features

Railway Broken Rail Clamp

Railway rail clamp, as an important tool in railway maintenance, mainly plays a role in the emergency treatment of railway rail break.

Application scenario

 

When the railway breaks the track, the broken track clamp is used to fix the broken joint in an emergency to ensure that the train can pass safely or reduce the risk of accidents.

 

 
01
 

apply

Apply to the emergency handling scenario where the rail crack is less than 50mm. At this time, it is necessary to set up the stop signal protection according to the provisions, a good splint or a large splint at the broken joint, and fixed with a first aid device.

 
02
 

significance

Rail clamp is an indispensable tool in railway maintenance, and its correct use is of great significance to ensure the safety of railway transportation.

 
03
 

Matters needing attention

In the case of emergency or temporary treatment, records and marks should be made to ensure the accuracy of subsequent work.

 

Our Products

20240509170305
 
20240509170402
 
20240509170243
 

 

 

Emergency treatment process

Emergency treatment: a good splint or bulging splint is placed at the broken joint, fixed with a first-aid device, and the fastener is tightened 50m before and after the broken joint, and the guard is assigned to ensure the safe passage of the train.
Temporary treatment: If the rail is seriously damaged or the broken gap is greater than 50mm, it is necessary to block the line, cut out the damaged part, insert the same type of rail, and use tools such as broken rail clips to fix. Tighten the fasteners within 50m of the front and back of the short track and release the train at normal speed.
Permanent treatment: For the emergency treatment or temporary treatment of the premises, should be timely welding, restore the seamless line track structure.

 

 
Factory And equipment
 
20230524112057c4df71ebca944894897ffb8fd0ebee23
20230524112101b29f1f904aa34afa95131ab84ea23f18
20230524112106b2b6002f99c4439fb785ad8509794714

 

 

 

Hot Tags: railway broken rail clamp, China railway broken rail clamp manufacturers, suppliers, factory, Rail Nylon Insulator, , , , , Railway Sole Plates

You Might Also Like

(0/10)

clearall