Replacement Guidelines for Worn Fastening Systems
Timely replacement is critical when damage exceeds repair thresholds.
Replacement Triggers:
Cracked Clips: Fractures >5mm length.
Corroded Components: Metal loss >10% of thickness.
Permanent Deformation: Bent clips failing tension tests.
Replacement Steps:
Isolate Track Section: Use POS (Possession of Site) protocols.
Remove Old Fasteners:
Cut seized bolts with rail saws.
Extract clips using extraction tools.
Install New System: Follow manufacturer's torque/alignment specs.
Special Cases:
Tunnels: Use low-profile fasteners for clearance.
Data Insight:
Replacing every 15-20 years is cost-optimal for ballasted tracks .
Routine Tasks:
Lubrication: Apply graphite grease to bolt threads to prevent seizing.
Clip Re-tensioning: Adjust every 5 years for spring clips.
Pad Replacement: Swap hardened pads (>70 Shore A hardness) every 8-10 years.