Railway Fastening System Installation
Mar 20, 2025
Steps for Installing the SKL Fastening System
| Step | Description |
|---|---|
| Preparation | - Inspect the sleepers (ties) and ensure they are in good condition. |
| - Clean the sleeper surface to remove debris, dirt, or old fastening components. | |
| Positioning Base Plates | - Place the base plates on the sleepers in the correct position. |
| - Ensure the base plates are aligned with the track gauge and rail alignment. | |
| Placing Rail Pads | - Install rail pads on the base plates to provide insulation and vibration damping. |
| Laying the Rails | - Position the rails on top of the rail pads, ensuring proper alignment. |
| - Use temporary clamps or supports to hold the rails in place during installation. | |
| Installing SKL Clips | - Attach the elastic SKL clips to secure the rails to the base plates. |
| - Use a clip applicator tool to ensure proper tension and alignment. | |
| Tightening and Adjustment | - Check the alignment and gauge of the rails. |
| - Adjust the clips and base plates as needed to ensure proper fastening. | |
| Insulator Installation | - Install insulating components (if required) to prevent electrical conductivity. |
| Final Inspection | - Inspect the entire fastening system for proper installation and alignment. |
| - Ensure all components are securely fastened and meet safety standards. |
