Rail Breakage Common Temporary Fixing Techniques
Temporary Fixing Techniques
1
Rail Breakage
Use Rail Clamps or Fishplates: Install temporary joint bars or clamps to hold the broken rail sections together.
Secure with Bolts: Tighten bolts to ensure the connection is stable.
Reduce Speed Limits: Implement slow-speed restrictions for trains passing over the repaired section.
2
Track Misalignment
Realign the Track: Use hydraulic jacks to lift and reposition the rails to their correct alignment.
Stabilize with Ballast: Add temporary ballast to hold the track in place.
Check Gauge: Ensure the track gauge (distance between rails) meets safety standards.
3
Ballast Washout or Sinking Track
Add Temporary Ballast: Fill the affected area with fresh ballast to stabilize the track.
Compact the Ballast: Use hand tools or portable equipment to compact the ballast and ensure stability.